Custom Concrete Pools

Infinity & Vanishing Edge Pools in Kelowna

Explore whether an infinity or vanishing edge belongs in a property-specific pool brief, subject to grade, sight lines, setbacks, structure, hydraulics, and approvals.

What this service covers

Infinity, vanishing, and negative-edge pools use an overflow edge and collection system to create a visual connection with the horizon. The effect can be considered for some Okanagan view properties, but a view alone does not establish feasibility.

The brief should identify grade, sight lines, lot access, nearby structures, property boundaries, drainage, retaining conditions, equipment space, and the intended viewing points from the home and terrace. Qualified professionals and the applicable municipality must determine structural, hydraulic, geotechnical, safety, and permit requirements.

Submitting a request does not mean the lot is suitable or that a particular edge system is included. A selected provider must document what it can deliver, which professionals are involved, and how operating and seasonal-care considerations affect the proposal. If the horizon effect is optional, compare a conventional edge on the same custom concrete pool brief before committing to the overflow system.

Planning benefit: A focused way to discuss the desired horizon effect without assuming the property is suitable.

Common situations

  • A hillside or elevated lot has a valley, lake, or landscape view
  • The desired composition uses an overflow edge to relate water to the horizon
  • The property needs an early review of grade, access, structure, and equipment space
  • You want feasibility separated from concept imagery before selecting a feature

What to confirm with a provider

  • Who evaluates grade, sight lines, access, soils, retaining, and collection-system space
  • Which structural, hydraulic, geotechnical, drainage, and permit documents are required
  • Named responsibility for the shell and retaining work, overflow edge and collection, pumping and returns, equipment, and service access
  • Who coordinates terrace drainage, decks, guards, circulation, neighbouring conditions, and landscape interfaces
  • Who commissions the complete system, its acceptance criteria, operating expectations, seasonal care, warranty terms, and exclusions. If a winter cover is part of the infinity-pool proposal, ask the selected provider to identify the covered water areas and any overflow or collection basin left outside that coverage. Have the cover fit, deck-anchor locations and nearby raised walls, water features or other obstructions documented before the surrounding finishes are finalized. Request the exact product's installation, care and removal instructions, and confirm who supplies, installs and checks the cover. Keep this optional cover scope separate from pool commissioning and the property's safety and permit review; confirm current City requirements rather than assuming a cover label establishes approval.

    Reference: Latham winter-cover planning reference (manufacturer).

What affects scope and cost

  • Length and height of the vanishing edge
  • Catch-basin size and equipment vault requirements
  • Structural engineering for retaining and shell loads
  • Access for excavation and concrete placement on steep sites
  • Finish detail along the spill edge and basin

Questions we hear often

Is every lot suitable for an infinity edge?

No. Grade, soils, setbacks, registered constraints, access, structure, hydraulics, drainage, equipment space, safety, and sight lines can all affect suitability. A property-specific review by the appropriate qualified parties is required.

Does an infinity edge use more water and energy?

An overflow collection and pumping system can change water and energy use. Ask the selected provider for system-specific equipment, controls, water-loss, operating, maintenance, and seasonal-care information.

Related services

Official planning sources

Municipal guidance can change. Use these official City of Kelowna pages to confirm the current application process and property-specific requirements: